Charing Cross Hospital

Laboratory Block 4Th Floor Microbiology Relocation

PROJECT DETAILS

ClientImperial College Healthcare NHS
Trust
Consultant EngineerEta Projects Ltd
Quantity SurveyorWT Partnership
ArchitectsBrunton Boobyer Partnership
CDMCWT Partnership
Value£1,200,000
Timescale9 months

DESCRIPTION

Imperial College Healthcare NHS Trust is rationalising the Pathology Department to Charing Cross Hospital. This involved the relocation of the Microbiology Departments from Hammersmith Hospital, St Mary’s Hospital and Chelsea and Westminster Hospital to Charing Cross Hospital. The project involved the strip out of the existing redundant installation and the installation of new to suit the specific requirement of a icrobiology Department.

DESIGN

The design of the new Mechanical services included ventilation/comfort cooling, steam/condensate, Low Temperature Hot Water (LTHW) heating, chilled water domestic hot and cold water services, drainage, hot and cold rooms, pneumatic tube system, laboratory gases and safety cabinet exhaust systems.

The Electrical services consisted of a new power supply, essential and nonessential power to the work areas, Uninterrupted Power Supply (UPS) for the CAT III area, lighting/emergency lighting, security, fire alarm, voice and data and power supplies to serve the Mechanical plant.

OBJECTIVES

To provide Mechanical and Electrical services to suit a new Microbiology Department. The existing ventilation and heating systems were utilised where possible and supplemented with new to ensure that the required space
conditions were provided.

A new power supply was provided to supplement the existing as the new area required a greater electrical load on the system than presently provided. The new laboratory CAT III laboratories require a dedicated protected supply.

SPECIFIC DESIGN REQUIREMENTS

The new Microbiology Department contained two CAT III laboratories. The services design was critical to the operation of the area. The layout and operation of the area was carried out in accordance with the requirements of Counter Terrorism.

This project posed a particular constraint on the security of the floor and the Trusts fire policy.

CONTACT US

EMAIL US

info@etaprojects.co.uk

WANT TO CALL US?

+44 20 7902 8570

WHERE TO REACH US

Eta Projects Ltd, No 5 C-D Bear Lane, London, SE1 0UH

    Name

    Email Address

    Contact Phone

    Message

    [recaptcha]