Commercial Case Study

Zentrale Deutsche Postbank AG, Friedrich-Ebert-Allee 114-126, Bo

Deutsche Postbank

Deutsche Postbank chiller was of an age where reliability of supply was at
serious risk. The building had serious issues with overheating during the
summer months. The project involved the strip out of the existing Trane
300 kW air cooled chillers and associated pipe work, valves, insulation,
controls, power / electrics, etc. and the installation of new.

Read more: Building Central Chiller Replacement

Goethe institute

The Goethe-Institut

The Goethe-Institut London is the German cultural establishment to
promote the Teaching, Arts and Literature of Germany to the rest of the
world.

The project involved the full building refurbishment of the structure and
services within a Grade 2 Listed Building.

Read more: Building Refurbishment

New Installation Roof 1

Royal Botanic Gardens, Kew Gardens

The Jodrell Laboratory Building is located at Kew Gardens. The project
related to the mechanical and associated electrical services associated
with the replacement of existing laboratory ventilation air handling
equipment, BMS and associated power.

Read more: Jodrell Laboratory Building Ventilation Plant Upgrade

Man-Group4

Man Group plc

ManGroup Plc appointed Eta Projects to provide Mechanical and Electrical
design services for the refurbishment of their Headquarter Building at
Sugar Quay, Lower Thames Street.