Case Studies Healthcare


guys-hospital_2776516bGuys Hospital

The project involved the design, tender and implementation of a
complete new replacement of the Guys Hospital site 11kV generators
to support the Hospital High Voltage infrastructure for the Site at
London Bridge.
The project involves the replacement of the existing 3x 2000kVA
generators with 3no 3600kVA generators.

Read more: 3x 3600kVA standby generators

St Thoms entranceSt Thomas’ Hospital

The existing 8 No air-handling units (4 No 3rd Floor North Wing and 4
No 5th Floor Lambeth Wing) are of the builders work type, built in situ
and are approximately 30 years old. The enclosures have been lined
with an acoustic material, which is now deteriorating and must be
replaced. The project related to the removal of the existing acoustic
lining and replacing with new to current standards.

Read more: 3rd and 5th Floor AHU’s Acoustic Lining Replacement

Marsden_Exterior-443x284Royal Marsden Hospital

The project involved the design, tender and implementation of a
complete new HV infrastructure for the Royal Marsden Hospital in
Chelsea. The project included two new UKPN intake sub-stations,
two new 1500kVA standby generators and inter-connectors between
each sub-station to provide resilience, redundancy and maintainability.

Read more: 2x 1500 kVA standby generators

charing cross

Charing Cross Hospital

Imperial College Healthcare NHS Trust is rationalising the Pathology
Department to Charing Cross Hospital. The project involved the strip
out of the existing redundant installation and the installation of new to
suit the specific requirement of a Microbiology Department.

Read more: Microbiology Relocation

Charing Cross hospital 430_tcm21-191637

Charing Cross Hospital

Imperial College Healthcare NHS Trust is upgrading the Wards at
Charing Cross Hospital. The project involved the strip out of the
existing redundant services and the installation of new to suit the
specific requirement of the new Hyper Acute Stroke Unit at
9th Floor level.

Read more: 9th Floor North Stroke Unit

The name is displayed at St Mary's Hospital where Catherine, Duchess of Cambridge is due to give birth, in LondonSt Mary’s Hospital

The project involved the design, tender and implementation for a
new HV infrastructure serving Quadrant 1 of the St Marys Hospital
site, Paddington. The project included two new UKPN intake
sub-stations supported by the addition of a 1500kVA standby generator
to support the existing site standby generator system and the provision
of LV inter-connectors between each sub-station to provide resilience,
redundancy and maintainability.

Read more: 1x 1500 kVA standby generator

st mary's newSt Mary’s Hospital

The Clarence Wing Board Room is the main meeting room for the senior
management at St Mary’s Hospital, Paddington. The project involved the
full refurbishment of the board room structure and services within a Grade
2 Listed Building.

Read more: Clarence Wing Board Room

Campus_Hammersmith_1--tojpeg_1417716218508_x2Hammersmith Hospital

A Block at Hammersmith Hospital is a large six floor Ward building
containing Operating Theatres, Private Patients Wards, Wards catering
for critical and non-critical patients and associated support facilities. The
project involved the strip out and replacement of the complete domestic
hot and cold water services, associated plant and sanitary ware.

Read more: A Block Domestic Services Replacement

Hillingdon-HospitalHillingdon Hospital

Hillingdon Hospital is undertaking a major backlog maintenance
programme at the same time as a major A&E development project
are taking place under a Procure-21+ programme.

Read more: Site HV / LV Infrastructure Upgrade